Every 7-14 days (2-3 applications per Crop)
Fruit crops – 4-6L/ha (400ml-600ml/100L)
Vegetable/ornamentals – 1-6L (100ml-500ml/100L)
Processing Crops – 2-6L/Ha
Caution: Peaches and Kiwi do not apply at fruit half-sized stage. Mix the product directly in the sprayer. Jar test before mixing with Calcium based products.